PART CONDITIONS — 3D PRINTING SHEFFIELD Blank planning outline. Saves/sends nothing automatically. Part/model name and revision: Units and overall dimensions: Quantity: What should the part do? Mating components / critical dimensions: What moves, how far, and how often? Force location, direction, support points and duration: Expected temperature and duration: Daylight / moisture / named chemical exposure: Visible or contact surfaces: Material grade required, if known: What is still undecided? Is the aim a form study, a functional evaluation, or an agreed production specification? Files/sketches included: Requested timing: Describe any proposed measurements as requirements, not as results. For CAD help, identify what needs designing or changing. Confirm actual materials, delivery and dispatch terms for the order.